Cabins, extensions and country homes — Herefordshire and the Welsh Marches

We build in oak, slowly, for people who mean to stay.

Twelve buildings a year, drawn and framed by the same eight people. No subcontracted carcassing, no value engineering in month nine, and a price we work out before you have paid us anything.

  • Established 2009
  • Eight people, one workshop
  • Booking from next spring
Scroll

Bramble Hut, Golden Valley — larch on screw piles, 26 m²

What it is made of

  • Douglas fir frames
  • Larch, left to silver
  • Welsh slate
  • Wood-fibre insulation
  • Lime and clay plaster
  • Sheep's wool
  • Handmade ironmongery
  • Cedar shingles
  • Ash floors, oiled
  • Air-source heat

What we build

Three shapes, endlessly varied.

Almost everything that leaves the workshop is one of these three. The plan changes with the site, the family and the budget. The frame, the detailing and the standard of finish do not.

One

Cabins and huts

14–40 m² · from £64,000

A single warm room with a good window and somewhere to put the kettle. We build them as studios, guest rooms, treatment rooms and holiday lets — craned in whole where the lane allows, framed on site where it doesn't.

  • Insulated timber frame on screw piles
  • Ground to kettle in 14–20 weeks
  • Usually permitted development

Two

Extensions and re-workings

20–90 m² · from £145,000

The commonest letter we get describes a cold back kitchen facing the wrong way. We take the back off the house, put the light where it should have been, and make the join look like it was always meant to be there.

  • Structural work and heritage detailing
  • Planning and building control handled
  • You stay in the house wherever we can

Three

Country homes

120–320 m² · from £520,000

Whole houses, usually on land a family already owns: a paddock corner, a barn footprint, forty years of nettles and a certificate of lawful use. Two years from the first walk to the keys.

  • Site appraisal and feasibility
  • Fabric-first, passive-leaning design
  • One contract, one team, one number

How we work

Six steps, and we do not skip them.

Most of what goes wrong on a building goes wrong before anyone lifts a tool. So we spend an unfashionable amount of time at the start, and we tell you what each stage costs before it begins.

  1. The first walk

    We come and spend a morning on the site with you: where the wind comes from, where the sun lands in February, which trees are staying. You get our honest read, including whether you should build at all.

    Half a day · free, anywhere in the Marches

  2. Feasibility

    A short document with two or three ways the building could go, an outline of what the planners will think, and a cost range we are willing to be held to. Roughly a third of these end in us saying no.

    Three weeks · £1,800

  3. Design

    Drawings, a physical model at 1:50, and samples of every material you will touch. We meet four times. Nothing goes to planning until you have stood in the room with tape on the floor.

    8–14 weeks · 6% of build cost

  4. Permission

    We write the application, argue it, and answer the parish. Ninety-one of our last hundred went through first time; the nine that didn't went through on appeal or amendment, and we absorbed the fee.

    8–13 weeks · fees at cost

  5. Frame and fit

    Cut in the workshop, raised on site by the people who cut it. You get a photograph every Friday and a call every other Monday, whether or not there is anything to report.

    16–40 weeks on site

  6. Handover, and the ten-year check

    A folder with every drawing, every product and every guarantee. Then we come back at one year, five years and ten to look at the joints, adjust the doors and put right anything the building has decided to do.

    Included, for a decade

186

buildings finished since 2009

91%

of applications approved first time

10 yr

structural warranty on every frame

Recent work

Eighteen months of building.

Six of the last twenty-two. Every one of these owners has agreed to take a phone call from you, which is the only reference we think is worth anything.

Hover a project for the detail

Twenty-six square metres of larch on screw piles, craned over a hedge in one piece on a Tuesday morning. Ten weeks from ground to kettle.

Cabin

Bramble Hut

Golden Valley, Herefordshire2025

A cold north-facing scullery replaced by thirty-four square metres of oak-framed kitchen, with a rooflight the whole length of the room.

Extension

The Long Kitchen

Weobley2025

Two hundred and twelve square metres on the footprint of a collapsed Dutch barn. Wood-fibre throughout, air-source heat, and a chimney that actually draws.

Country home

Pitch House

Clun Valley, Shropshire2024

A painter's studio at the top of a steep garden. North light, a small burner, and a floor that does not mind turpentine.

Cabin

Sallow Studio

Hay-on-Wye2024

Three linked volumes stepping down the slope, so the house never shows more than one storey to the lane it sits above.

Country home

Nether Field

Presteigne, Powys2024

Two rooms and a porch at three hundred and eighty metres, built to be shut for the winter and opened in March with nothing to put right.

Cabin

The Bothy

Black Mountains2023

They were the only people who told us what the thing would actually cost before we had paid them a penny. Two years on, the number on the final invoice is the number from the first letter.
Marianne Weld Pitch House, Clun Valley

Enquire

Tell us about the site.

We take twelve buildings a year and we book about nine months ahead. The more you can tell us now, the more useful the first reply will be — and if we are not the right people for it, we will say so and name two who might be.